Metal Stud Ceiling Framing Details
For pricing and availability.
Metal stud ceiling framing details. Steel framing is easier to handle because steel studs weigh 1 less than wood studs and can be installed at 4 on center. Contact clarkdietrich technical services at 888 437 3244 for any questions on these details or if you. To keep the ceiling from sagging screw a metal stud on edge perpendicular to the studs. 20 products in metal studs.
Long term maintenance costs are reduced because steel. All framing lumber should be the correct grade for the intended use and 38 mm x 89 mm nominal 2 x 4 or larger should bear the grade. Clarkdietrich cold formed steel c studs general cold formed steel framing faqs general steel home construction faqs new clarkdietrich itools structural stud lookup tool clarkdietrich studs are made in a variety of flange widths to meet different applications. If there is no room for a stud above attach short studs to each ceiling stud and screw them to the framing above.
We are aggressively working on updating the hundreds of cold formed framing details located in the cad library with updated product information. Updated clarkdietrich building system cad details can be found in the new clarkdietrich s itools cad library. The details contained in this document are intended as a general guide for using steel stud manufacturers association ssma member products. Make sure you install the metal studs every 15 25 otherwise they won t be able to support the weight of the plasterboards.
On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud. 3 625 in w x 96 in l x 1 25 in d prostud 3 5 8 25 ga galvanized steel metal stud. Framing members should be straight true and of uniform dimension. Our metal framing product line includes.
2 1 2 250s 3 1 2 350s 3 5 8 362s 4 400s 5 1 2 550s 6 600s 8 800s 10. Then cut short studs to attach to that stud to the framing above about every four feet. 3 2187 in w x 120 in l x 0 875 in d galvanized steel metal stud. Marino ware offers a complete line of cold formed steel framing products.
Studs and joists must be in true alignment. The best technique for framing steel walls is to first fasten the floor and ceiling tracks and then install the studs one at a time. Steel framing offers marketing advantages because consumers recognize steel as a superior framing product for its fundamental characteristics. The metal stud ceiling frame is completed after about 3 hours of continuous work.
This brace sits on top of the ceiling studs. These products should not be used in design or construction without an independent evaluation by a qualified engineer or architect to verify the suitability. Drywall framing metal studs.